Deploy AI Compute in 90 Days

The BluePod A1 is a turnkey, factory-built air-cooled AI data center in a standard 40HC shipping container. No liquid cooling complexity. No ground-up construction. No permits.

264 kW
IT Cooling
5×45U
Rack Space
1.21
PUE @25°C
90 Days
Deploy Time
BluePod A1 Container — Exterior View

Purpose-Built for AI Workloads

Traditional data centers take 18–36 months and millions in upfront capital. BluePod delivers live AI capacity in 90 days.

90-Day Deploy

Factory-built and pre-tested. Ship to site, connect to power — live capacity in 90 days. No permits, no ground-up construction.

💧

No Chilled Water

Precision air-cooling + evaporative pre-cool eliminates chilled-water plant CAPEX and complexity entirely.

📊

PUE 1.21

Industry-leading for air-cooled. ~40% less overhead energy versus Tier-3 retail at typical operating conditions.

📦

Modular & Scalable

Add containers as demand grows. Redeployable to new sites. Same repeatable unit from 1 box to 20+ MW clusters.

Inside the BluePod A1

A complete AI compute infrastructure packed into a standard 40HC shipping container. Every subsystem is factory-integrated, tested, and certified before shipment.

BluePod A1 — Exterior cutaway showing cooling system

Exterior view — integrated water curtain pre-cooling + precision A/C units

BluePod A1 — Interior server racks

Interior — 5 × 45U server racks with cable management and overhead HVAC

🖥️

Compute

5 × 45U standard racks · 52 kW each · accepts any air-cooled GPU or CPU server

Power

400 kW total input · AC 400V ±10% · C13/C19 PDUs · single 3-phase feed · UL certified

❄️

Cooling

4 × precision in-row A/C (N+1) + evaporative water-curtain pre-cooling · 264 kW total

🔥

Fire Safety

NFPA-compliant FK-5-1-12 clean agent · smoke + heat detectors · automatic emergency power shutoff

📡

Monitoring

24/7 remote telemetry — temperature, humidity, power draw, A/C health, fire status

🌐

Network

Per rack: 2 × 25G SFP+ fiber + 1 × 1G RJ45 · IP54 external access panel

Intelligent Remote Monitoring

24/7 remote telemetry provides full visibility into every subsystem. Temperature, humidity, power draw, cooling status, and fire safety — all monitored in real time.

BluePod intelligent monitoring dashboard

Integrated monitoring dashboard — real-time telemetry across all subsystems

Full Specification Sheet

Complete technical parameters for the A1 40HC Air-Cooled Container.

CategoryParameterSpecificationNotes
PhysicalDimensions12,192 × 2,438 × 2,896 mm40HC ISO standard
PhysicalGross Weight (loaded)≈ 20 tonnesFloor load ≥ 3 t/m²
PhysicalCorrosion ProtectionExterior C3H · Interior C3Marine / outdoor rated
ElectricalInput VoltageAC 400V ±10%, 3-phase, 50/60 HzSingle feed
ElectricalMax Input Current≤ 800 A per container
ElectricalTotal Input Capacity400 kWIT + cooling + aux
ElectricalPDU InterfaceC13 (36×) + C19 (56×) per rack3-phase aviation optional
ElectricalGrounding Resistance≤ 4 ΩSPD Type II required
CoolingArchitecturePrecision in-row A/C + water curtainNo chilled-water plant
CoolingTotal Heat Rejection264 kWN+1 redundancy (4 units)
CoolingPUE @ 25°C / 100% load1.211.35 @ 45°C ambient
NetworkPer-rack Uplinks2 × 25G SFP+ · 1 × 1G RJ45IP54 access panel
SafetyFire SuppressionFK-5-1-12 clean agent (Novec 1230)NFPA 2001 compliant
SafetyNoise @ 5 m full load84 dBIndustrial environment

PUE Across Ambient Temperatures

Industry-leading energy efficiency for air-cooled infrastructure. Consistent PUE performance from 15°C to 45°C ambient.

1.196
Best-Case PUE
at 15°C ambient
1.21
Typical PUE
at 25°C / 50% RH
1.35
Max PUE
at 45°C ambient
Metric15°C20°C25°C30°C35°C40°C45°C
A/C Supply Temp25°C25°C25°C25°C25°C25°C25°C
Indoor Unit Power (kW)46.248.050.253.657.970.678.5
Outdoor Unit Power (kW)0.480.721.202.204.244.524.52
Total System Power (kW)284.7286.8289.4293.8300.2313.1321.0
PUE1.1961.2051.2161.2351.2611.3151.349

Config: 4 × CR066 indoor + 2 × LVC170 outdoor · IT load: 238 kW · Ambient RH: 50%

From Purchase Order to Live Capacity — 90 Days

Minimal civil works. Power, pad, and connectivity — that's all you need.

Week 1–2

PO & Build Start

Container enters factory. Customer preps civil pad and power feed in parallel.

Week 3–8

Manufacturing & QA

Factory assembly, integration test, QA inspection, pre-shipment acceptance.

Week 9–10

Shipping & Logistics

Container shipped via road or sea. Site civil and electrical work completes.

Week 11

Installation

Container placed on pad. Power, network, grounding connected and verified.

Week 12

Commissioning & Live

Systems go-live. Remote monitoring activated. Operator training complete.

✓ Speed Advantage

90 days PO → live capacity vs. 18–36 months for a purpose-built data center. No permits, no ground-up construction.

What You Need Before the Container Arrives

🏗️ Civil & Foundation

Floor load≥ 3 t/m²
Foundation≥ 200 mm, C30
Levelness≤ ±5 mm
Gap between units≥ 5 m
Site boundary≥ 8 m setback

⚡ Electrical Supply

InputAC 400V ±10%, 3φ
Max current≤ 800 A
FeedSingle 3-phase
Grounding≤ 4 Ω
Surge protectionSPD Type II

🌐 Network & Data

External portIP54 panel
Per-rack2×25G SFP+ + 1G RJ45
FiberOS2 or OM4
UpstreamDual path recommended
BGP/IPCustomer-provided
/* AUTH OVERLAY */ html:not(.authed) body > *:not(#auth-overlay){display:none!important} #auth-overlay{position:fixed;inset:0;z-index:9999;background:var(--bg);display:flex;align-items:center;justify-content:center;padding:2rem} .auth-box{text-align:center;max-width:380px;width:100%} .auth-logo{font-size:2rem;font-weight:800;margin-bottom:2rem;color:#fff} .auth-logo span{color:var(--accent)} .auth-box h2{font-size:1.3rem;font-weight:700;margin-bottom:.5rem;color:var(--text)} .auth-box p{color:var(--text-muted);margin-bottom:1.5rem;font-size:.95rem} #auth-form input{width:100%;padding:.875rem 1rem;background:var(--surface);border:1px solid var(--border);border-radius:10px;color:var(--text);font-size:1rem;outline:none;margin-bottom:1rem;font-family:inherit} #auth-form input:focus{border-color:var(--accent)} #auth-form button{width:100%;padding:.875rem;background:var(--accent);color:#fff;border:none;border-radius:10px;font-size:1rem;font-weight:600;cursor:pointer;font-family:inherit;transition:background .2s} #auth-form button:hover{background:var(--accent-light)} #auth-error{color:#ef4444;font-size:.85rem;margin-top:.5rem}

Construction Drawings

Detailed engineering drawings showing container dimensions, door clearances, cable/power entry positions, and airflow requirements.

A1 Overview Drawing
General Arrangement — Side, Front & Top Views
A1 Door Layout
Door Layout & Clearance Dimensions
A1 Cable & Power Entry
Network Cable & High-Voltage Entry Positions
A1 Airflow Requirements
Airflow Clearance & Ventilation Requirements

Built to Global Safety Standards

Every unit is factory-certified before shipment. Designed for outdoor deployment in any climate.

UL

UL Electrical

Complete electrical system is UL-listed. Covers PDU, switchgear, arc flash, insulation, and component safety.

NFPA

NFPA 2001 Fire

FK-5-1-12 clean-agent suppression. Smoke + heat detectors, audio/visual alarm, automatic emergency power shutoff.

ISO

ISO Container

40HC ISO enclosure modified per class society (DNV/BV) requirements. Structural certification maintained post-modification.

C3H

Corrosion C3H/C3

Exterior C3H marine-grade coating. Interior C3. Suitable for coastal, tropical, and high-humidity outdoor sites.

IP54

IP54 Ingress

External cable and network entry points rated IP54: dustproof and water-splash resistant for outdoor installations.

SPD

Surge Protection

SPD Type II mandatory on main feed. Lightning protection per IEC 62305. Ground resistance: ≤ 4Ω.

Let's Deploy AI — Fast.

90-day deploy · PUE 1.21 · 264 kW · UL + NFPA certified